MESTRiQ icon MESTRiQ
Manufacturing Intelligent Platform

Your production floor, in real time.

One real-time system for OEE, production scheduling, maintenance and AI-assisted decisions — built for manufacturing floors.

Most factory floors run on tools that were never meant to run a factory floor.

01

OEE tracked by hand in spreadsheets, a shift behind reality.

02

Schedules built on a whiteboard, redone every time a machine goes down.

03

Maintenance is reactive — a breakdown is the first sign something was wrong.

04

Data exists somewhere, but nobody has time to turn it into a decision.

Two-minute walkthrough

See it end to end, before you dig into the details.

Dashboard, scheduling, maintenance and AI — walked through on real MESTRiQ screens.

What MESTRiQ does

Four systems that usually don't talk to each other, in one place.

01 — Real-time OEE

See what's actually running, right now.

Availability, performance and quality, computed from real machine events and counters — not a manual entry form. Shift- and day-scoped, with the client's own timezone handled correctly, so "today" means today.

MESTRiQ OEE overview dashboard showing 83.9% OEE, availability, performance and quality
Dashboard — Overview
01 — Real-time OEE

Live down to the shop floor itself.

A running timeline of every machine's day — colored by state, with each downtime segment tagged by its own reason. Real-time push updates with an automatic poll fallback, so a screen never goes stale.

MESTRiQ machine timeline showing run, idle and down history for each machine today
Dashboard — Machine Timeline
02 — Production scheduling

Scheduling down to the machine, not just the order.

Most ERPs stop at the manufacturing order. MESTRiQ schedules at machine level, against real shift and calendar working windows — and drafts a reschedule automatically the moment a line goes down, for a supervisor to review and apply.

MESTRiQ production scheduling Gantt view across five machines over 14 days
APS — 14-day machine schedule
03 — Maintenance

Maintenance that runs itself.

Work orders logged, assigned, prioritized and closed — gated by who should do what. Preventive maintenance triggers on calendar days and usage hours, computed from real machine run-time, and asset history is derived live from downtime events instead of a separate manual log.

MESTRiQ CMMS work order list with priority, status and cost
CMMS — Work orders
04 — AI-assisted decisions

AI that reads your plant, not a generic chatbot.

A plain-English narrative of today's OEE and downtime pattern, an advisor that prioritizes open work orders and low-stock parts, and a troubleshooting chat scoped to this plant's own data — triggered manually, so there's no surprise API spend running in the background.

MESTRiQ AI Plant Copilot and Smart Insights panels with plain-English recommendations
Plant Copilot & Smart Insights
Also in the OEE module

Reports that answer "why," not just "what."

Five report types — OEE trend, downtime Pareto, loss heatmap, SKU performance, productivity — plus CSV and PDF export for any date range, all on the same timezone-correct data as the live dashboard.

MESTRiQ downtime Pareto chart ranking downtime minutes by reason MESTRiQ top downtime reasons ranked table with minutes and percentage
How it connects

Talks to the machines you already have.

MESTRiQ connects directly to your equipment over Modbus, MQTT or a simple API — most lines don't need new hardware. Signals go straight from the machine into the platform, so what you see on screen is what's happening on the floor, not what someone typed in at the end of the day.

Modbus
MQTT
REST API
PLC / relay I-O
Machines & PLCs
MESTRiQ platform
OEE · Schedule · Maintenance
Recommended action
Who it's for

Built for manufacturers who need this to work without a six-month rollout.

MESTRiQ is priced and built for small and mid-sized manufacturers — factories that need real OEE and scheduling visibility now, not a year-long ERP project.

SME

Sized and priced for small and mid-sized manufacturing floors.

Days

Connected to your first line in days, not months.

1

One system instead of separate OEE, scheduling and maintenance tools.

Request a demo

See MESTRiQ running on a floor like yours.

Tell us a bit about your operation and we'll set up a walkthrough.